Extension and Rehabilitation Works of Quay No. 7 in the Port of Tripoli, Tripoli - Lebanon |
Type of Project: |
Quay Extension and Rehabilitation of Quay Infrastructure Work |
Project Duration: |
August 2009 – February 2010 |
Client: |
Office d’Exploitation du Port de Tripoli |
Consultant: |
Seatec - Engineer Patrick Sleiman |
Contract Amount: |
USD 980,000 |
Project Description:The project involves the following:
- Quay No. 7 Extension with main activities as follows:
- Dredging to -8.0m the basin area located in front of the quay
- Construction of 26 lm of quay to -8.0 m with underwater concrete
- Construction of the new superstructure and slab on grade behind the quay
- Installation of the quay accessories (bollards, fenders)
- Rehabilitation of the Water Feeding System with main activities as follows:
- Construction of a new pipe network (GRP, HDPE, PVS, etc…) for supplying the vessels with water
- Installation of 8 stainless steel pumps with 16 exit coupling and water meters
- Installation of radio transmission boxes for sending all data to the port administration post control.
|