Project Description:
The project involves the following:- Creating an access ramp and excavation of the broken part of the breakwater
- Supply and installation of quarry run, rock 2-5 ton and rock 6-10 ton
- Casting and installation of Accropodes 12 m3
- Repair of the existing seawall and construction of a reinforced concrete slab along the quay walls
- Dredging the basin